Conversion of former RAG high-rise building

Dortmund

A place to live and experience

The interaction of working and living promotes vitality in every city center.

Life has shifted to the outskirts of cities, where, in contrast to the city center, generous green spaces are available nearby and the workplace is also easily accessible by car. As a result, the inner cities lost a large proportion of their inhabitants and were filled with work and retail space. Living and working were separated.

The digitalization of workplaces is breaking down this traditional structure. People can work from anywhere, making the traditional office building less important. Working environments are becoming more flexible and location-independent, but at the same time require an attractive range of leisure activities. New mobility concepts are increasingly making it possible to do without investing in a private car.

The conversion of the former RAG high-rise building into a residential building addresses these changes, which affect both cities and their citizens, by finding a solution for both.

A. Location

The building is in a privileged location in the heart of the city. Situated next to the opera house, it has its main entrance on the north-south axis of Hansastrasse. The extensive retail areas, the varied gastronomy and various leisure facilities can be reached on foot in a very short time. The location is very well connected thanks to its proximity to public transport, the subway and the main railway station. Users with their own vehicle can use the existing garage with 121 parking spaces.

B. Concept: a place to live and experience

The building rises like a pyramid. The existing building has structures with deep areas on the first floor and second floor, which are still suitable for commercial use with internal service cores. Our concept retains the commercial use of the first two floors - ideally, the current co-working spaces can continue to be offered - and begins with the conversion to residential space on the second floor. The new residential units are located along the existing corridors, and the flexibility of the office layout is reflected in the new apartment layout, which allows for a range of different sizes and unit types. Loggias or balconies are provided in the apartment layouts to give each resident private access to the outdoors. The roof spaces created by the staggering of the building volume on every other floor are transformed into gardens for the community of residents, which also allow for a concept of curated urban gardening. The building offers interesting views in every direction. The RAG building is no longer just a place to work, but rather a place to live and experience. The reuse of the existing building fabric, the reduction of the ecological footprint by bringing residents back into the heart of the city, the sustainable and social way of life through generous shared green spaces all fit into the current context.

A new use requires a new identity. The RAG building has very formal features with a strong presence - the regular grid of the metal panels with the horizontal bands in front contrasts with the strongly pronounced volume development of the complex.

C. Facade concept

Retention of the existing façade with integration of greenery: the curtain wall with its typical glass elements will be retained. Only the windows will be replaced to allow natural ventilation of the apartments. Individual floor-to-ceiling openings will be created that open up like a “French balcony” to the cleaning corridor and offer the residents a perceived outdoor space. This itself will be planted with climbing plants. In this way, the RAG building is covered with green strips like a tree, making the outer shell appear different depending on the season.

Data

Preliminary building application

2020

Address

Hansastraße 95
44137 Dortmund
Germany

Client

Aroundtown SA

Site Plan
Elevation
Grundriss Ground Floor
Floorplan 2nd Floor
Floorplan 10th Floor
Section

Urban Densification Strategy Max-Eyth-Straße

Dortmund

The market development in Dortmund as an office location is stagnating and the commercial offers are essentially identical. We propose a strategy that restructures the large-scale property at Max-Eyth-Strasse 2 in a small-scale manner and thus activates it in an invigorating way.

Preserving qualities, creating diversity

The existing trees will nevertheless be largely retained and combined with a simple but sophisticated group of buildings of different typologies.

The design is based on the same scale and connected via a central access route, creating a family of buildings with a recognizable formal connection, while at the same time giving the individual buildings a high degree of independence with their own addresses.

Urban Densification Strategy

On Max-Eyth-Strasse, the buildings are set back 5 m from the edge of the sidewalk. Towards the property boundary in the east, we will preserve the existing trees, in particular the dense green backdrop, in order to protect the adjacent private gardens. This will create four decentralized addresses. All four are located on a central access route. In this way, densification takes place in the center of the group of buildings - at the edges, especially towards the neighboring residential area, the contours dissolve.

The size, storeys and arrangement of the buildings at the four addresses are designed as a variable system that can react to the actual space requirements.

The positioning of the future buildings ensures the necessary noise protection both inside the new ensemble and from the neighboring residential buildings.

Building typology And Floorplan Efficiency

The building typology is based on an efficient construction grid of 1.35 m. The floor plan dimensions allow adaptation for different conditions and uses.

The fit-out can be carried out in different materials according to the tenants' wishes: Plasterboard, wood, glass or composite. If required, individual buildings can be linked together on different levels.

The resulting office spaces are ventilated naturally as far as possible. Mechanical ventilation and air conditioning are available on request as optional extras; the space provision for this is taken into account. The ground floor zones of some buildings (variants 1 to 3) can be rented out as retail space.

Floorplan Ground Floor

Data

Completion

2017

Address

Max-Eyth-Straße 2
44141 Dortmund
Deutschland

Client

KORE GmbH
Frankfurt am Main

Floorplan Regular Floor

Porsche Center

Dortmund

Porsche is synonymous with technical perfection, formal precision, passion, speed and understatement.

With its new building, Porsche Dortmund gives significant shape to the sensuality of these attributes.

The building is constructed parallel to the highway (B1) - as a direct entrance to the Airport Business Park. The building consists of two components - a base to absorb the topography and a metal membrane resting on it, which envelops a space 8 meters high and 130 meters long. The silhouette is reminiscent of an extruded aluminum profile - a significant reference to the high technical qualities of PORSCHE products. Everything is visible - technical service is staged.

A café lounge provides online images of current racing events, shows ongoing production processes or test runs of the PORSCHE typology. At night, the building makes a media appearance and communicates PORSCHE images via the transparent façades with light installations. The building's structures are all prefabricated - the concrete construction of the base floor consists of inclined columns curved in three directions, computer-animated laser and welding machines produce precise steel and aluminum components that are assembled as individual modules on the construction site to form the building.

Data

Completion

2003

Address

Ferdinand-Porsche-Straße 4
59439 Holzwickede

Client

Porsche Zentrum Dortmund

Floorplan Ground Floor
Section

Westfalenforum – Re-think the Urban

Dortmund

The era of inner-city shopping malls and shopping streets is coming to an end. New forms of retail and digital payment methods are making old-style shopping malls obsolete. This creates the opportunity to rediscover the city as a living space and give it back to the people. However, it is by no means possible to simply replace retail with housing.

Urbanity is created through plurality

This includes mixed uses as well as different residential typologies that promote real neighborhoods and generate identification potential for one's own “Kiez”. Sustainability, the lowest possible energy requirements, resource awareness from the limited building site to the selected building materials, mobility, etc. are self-evident aspects of the planning. However, the essential characteristic should be the creation of new places where people like to live.

A - Access

A group of buildings of different types with differentiated heights forms a new neighborhood. It is linked by public paths, alleyways and small squares - for access to the buildings, small-scale retail, eating and drinking or simply for spending time. The quarter is integrated into the overarching network of routes in the city center between the main train station, Westenhellweg and Marktplatz or Hansaplatz.

B - Mixed Use

The use of the buildings and floors will be mixed. Small, adaptable stores, cafés and restaurants will be created on the first floors, which can be extended to the first floor if required. Commercial uses will also dominate the first floor - offices, doctors and the like. The basement brings the buildings together under one floor and forms a continuous storey for parking spaces, technical rooms and other ancillary areas.

C - Sustainability

The use of materials, an efficient energy concept, short distances, the multi-layered linking of individual private and public mobility, social and cultural acceptance and other sustainability aspects are developed from the outset in a multi-professional team and brought together in an overall concept. A key starting point for us is the conceptual integration of an accessible green backdrop. As a structural break, it separates the floors with commercial use from those with residential use. It runs through the buildings, the courtyards, becomes denser at selected edges, recesses or terraces and gathers as a roof garden with bridges connecting all the buildings - a multi-storey park designed for the residents of these buildings.

D - Mobility

The group of buildings on Amiens Square is located in the immediate vicinity of Dortmund's main railway station with a variety of regional and national connections as well as direct access to inner-city public transport with buses and the S-Bahn. We will combine these options with a concept that ensures individual mobility - through an internal sharing system for e-bikes and cars that are available to residents. We expect to be able to at least halve the number of parking spaces required in this way. The remaining parking space requirement will be covered in the basement.

Site Plan
Floorplan Ground Floor
Elevation West

Data

Study

2017

Address

Kampstraße 37 - 39,
Hansastraße 5
44137 Dortmund
Germany

Floorplan Regular Floor
Elevation East
Longitudinal Section

House at MIR

Gelsenkirchen

With its wedge-shaped cubature and variety of uses, the Haus am MIR mediates between the public use of the “Musiktheater im Revier - MIR” and the adjacent residential development to the east of Schalker Strasse. In terms of space and design, the new building frames and accentuates the current, very heterogeneous “non-space” on the east side of the MIR.

The recessed first floor is integrated into the public space through its transparency. This effect is reinforced by a homogeneously designed theater forecourt surface that incorporates the new building. An independent, highly recognizable urban space is created between the different uses.

Data

Completion

1997

Address

Kennedyplatz 14
45881 Gelsenkirchen

Client

Musiktheater im Revier, Gelsenkirchen

Detail Façade

Urban Densification Study Nordhafenquartier

Berlin

The most urgent goal of the urban densification study for the Nordhafen quarter is to develop the site as part of a future living environment in the new Europacity. For us, Europaplatz is an urban campus - a meeting place for residents and everyone who works here.

In addition, the study discusses the overlapping of private and publicly accessible uses, in parts also within the building, as well as the possibilities of resource-saving measures for heating and cooling at this special location.

A new district emerges

The inner-city wasteland, which has so far been largely unused or only rudimentarily used, is set to become a lively district with a direct connection to Berlin's main railway station. Despite good connections to the transport network, the site must nevertheless be understood and thought of as an island, as it is separated from the surrounding districts by various spatial barriers. Extensive railway tracks prevent direct contact with Wedding, while the Spree Canal forms a natural border with Mitte. New bridge connections will counteract this peculiarity, but will not be able to eliminate it. This makes the new district's own urban identity all the more important. The newly created town square as the heart of the new quarter will become an address, the inner open spaces a private garden.

Construction and sustainability

The complexity and multitude of technical systems should be kept to a necessary minimum. To this end, the solid components are activated and circulated with cool night air so that the coolness stored at night naturally compensates for the internal heat loads that arise during the day. Earth ducts and - where possible - evaporative cooling from the Spree canal provide the necessary cold air. Circulation through the building is initiated by a “chimney” (stair tower), which is routed beyond the parapet edge of the building.

Site Plan
Implementation and urban context
Floorplan Ground Floor

Data

Completion

2013

Address

Heidestraße
10557 Berlin
Germany

Client

CA Immo, Berlin

Elevation West | Façade Structure
Elevation Detail | Façade Structure
Section | Façade
Cross-Section | Cooling strategy
Floorplan 10th Floor
Elevation South | Façade Structure

Competition Urban Center

Berlin

The Urban Center Neu-Hohenschönhausen project is to be developed in accordance with the basic principles of ecological and social sustainability, a new hotspot of urban biodiversity, a green hub in the ecological system of the metropolis. Municipally controlled urban development based on public housing companies and cooperatives can prevent the negative effects of speculation and gentrification. The planning implements various standards of green in order to radically improve the social and ecological quality of the urban context. By combining nature-based solutions with the help of innovative and sustainable technologies, new qualitative, spatial and livable standards are created. The aim is to create a modern and lively new urban district. In the medium term, Falkenberger Chaussee will be rethought as a lively green axis in connection with the transport transition and electric motorization.

The available plot of land with a surface area of ​​around 6 hectares will be divided into three building plots: Building plot 1 along Falkenberger Chaussee: A large entrance pergola with a market hall marks the beginning and creates a connection with the neighboring shopping center. Living and working areas will be accommodated in a large modular and hybrid city shelf in two sections. With its perfect southwest orientation and green terraces, it fulfills people's desire for contact with nature and for sufficient open space with privacy. All infrastructure facilities of the new district, small shops, library, theater, family center, and an above-ground neighborhood garage for 200 cars will be integrated into the city shelf. A green high-rise building forms the signature.

Construction site 2 west of the cinema: The Berlin apartment block is being rethought, diagonally and modularly, with a diverse mix of apartments, duplex apartments if possible, townhouses integrated on the ground floor and first floor with direct access, enclosed and green inner courtyard, allotments in the courtyard and on the roof.

Construction site 3 east of the cinema: A cooperative quarter is planned here with a participatory planning model for alternative and communal forms of living and working, 30% cluster apartments + commercial/creative workshops + a public and green courtyard for community activities outdoors.

A completely CO2-neutral wooden city with model character is proposed. With wood from urban planning to the execution details, the new urban district also gets its own aesthetic identity. The creation of vertical and horizontal green spaces contributes to the character. Modularity and flexibility of the building elements in combination with simple and robust structures should promote longevity and a continuous mix of uses.

The interface between living and the city is formed by the ground floor and access zones, as well as arcades and staircases. The aim is to create lively spaces with a variety of uses and community offers. Courtyards and small, intimate squares offer village security, but also the opportunity for networking, new urban hotspots.

ECOLOGY

The use of state-of-the-art irrigation and rainwater collection systems and the selection of native plants - with high CO2 storage capacity, removal of air pollutants and attraction for pollinating insects - are among the core points of the project to increase comfort in the buildings and the well-being of the community. The new district is to have car-reduced living. The central district street will be traffic-calmed and developed as an Active Street.

In line with the ecological approach, Falkenberger Chaussee will be intensively greened and calmed with new rows of trees. A municipal sports park with covered sports fields will be built along the railway tracks in the green embankment under the railway overpass. On the south side of Falkenberger Chaussee, a new attractive train station with an integrated mobility hub (car sharing, e-bike station, bicycle parking garage) is planned in the form of a large roof folding over the tracks.

Data

Competition

2021

Address

Falkenberger Chaussee
13057 Berlin

Awarding Authority

Senate Department for Urban Development and Housing

Partner

Landscape architecture:
Hannes Hörr, Stuttgart

New Building On Aktienstraße

Mülheim an der Ruhr

The height and position of the new building is aligned with its urban surroundings. The front edge is flush with the neighboring building. In order to make the façades facing Aktienstraße more prominent and to increase the visibility of the building on the site, the volume is planned across the entire width of the plot.

A steel construction with a timber frame façade is planned, which will be curtain walling. This materiality is not only sustainable, but also creates a better quality for the employees working there thanks to its tactile feel.

Conceptually, the volume is organized in a strong base with a “flying” upper block to create a new scale on the very different fronts (e.g. fast train connections, industrial character with large and less street-going buildings). Instead of one large block, the concept focused on working the volume in its height and in two main parts, with less weight due to the “aerial plane”.

Usage

The allowance for a large market activity attracts a high contingent of users to the site. This is reinforced by the office workers and visitors to create a lively place.

The emphasis on the aerial floor of the parking speaks to the less human scale of the railroad line and the industrial buildings, allowing a new and elevated view of the surroundings. The two-story commercial space includes a storage area, mechanical rooms, restrooms and circulation cores. Intended as a large retailer, the design of the ground floor and first floor forms a self-contained and strong base, which connects to the office building via the equally self-contained and external access cores.

The upper four-storey volume will be an airy and transparent body for office use. The external circulation cores are important for the flexible use and organization of the floor plans.

Open spaces

The site is higher than street level. For this reason, the entrances to the project site are based on the gradient of the current access road. The ramp to the parking deck is planned as an independent element and sits on the straight level of the access road.

In addition to the ramp, entrance areas, technical and delivery areas as well as the required parking spaces for bicycles are planned. A smart pool is also planned for flexible mobility. Together with the public transport system, the parking deck meets the number of parking spaces required for office buildings and businesses.

Data

Study

2019

Address

Aktienstraße 23
45473 Mülheim an der Ruhr

Client

LIANEO

Views
Section
Floorplan 3rd Floor
Concept Floorplans

Restructuring Old Piano Factory

Berlin

Sustainable architecture means creating possibilities.

For our office location in Berlin, we have transformed an old piano factory in Berlin-Mitte into a residential and office building, giving it a new lease on life.

In doing so, our goal was to intensify the existing qualities while also meeting contemporary demands for living and working.

Data

Completion

2011

Address

Brunnenstraße 156
10115 Berlin
Deutschland

Client

PETERSENARCHITEKTEN
Gesellschaft für Architektur
+ urbane Strategien mbh

Wulf-Hefe-Gallery

Werl

The goal of the "Hefe-Galery" project is the redevelopment of an inner-city brownfield site, whose previous use as a brewery became obsolete with the demolition of the building.

The new building compensates for the deficit in event and dining spaces. The differentiation of the retail structure attracts new external customer traffic, thereby strengthening Werl's inner-city retail landscape beyond just the immediate location.

The limited land resource has been occupied by a two-story building that aligns with the local scale. Retail, dining, logistics, and administration are located on the ground floor, with parking and technical facilities on the upper floor, as well as event spaces on both levels. Green areas are incorporated into the rooftop.

The primary structural framework consists of a prefabricated reinforced concrete construction with spans of 10x10 meters on the ground floor and 20x30 meters on the upper floor. After completion of the second construction phase, the usable area will be approximately 12,000 m².

The building features a central control system for optimized resource management. Rainwater is collected decentrally, stored centrally in a cistern, and then directed into a greywater system. High visitor traffic is managed through a complex supply and disposal concept that takes into account day and night cycles to minimize impact on the surrounding neighborhood.

Flooplan Groundfloor
Detail Facade

Data

Completion

2008

Address

Soester Str. 26
59457 Werl
Germany

Client

Grundstücksgesellschaft Friedrich Bremke GmbH & Co.KG

Sections