Spreestudios – Platte and Kantine

Berlin

In the 1920s, this place was a magnet for the public - the Lichtenberg municipal bathing establishment was located here, with up to 17,000 visitors a day. At the beginning of the 1950s, the customs administration of the former German Democratic Republic (GDR) was set up here to monitor the Spree and remained in place until the 1990s.

In the following decades (1990 to today), the area was not used. Nature reclaimed the area - the former open-air swimming pool became an enchanted natural site - “nature took over”. Only two historic buildings survive from the time of the river baths: the former restaurant and the bath attendant's house. Two of the former three swimming pools have now been converted into a small marina with a waterline of around 200 meters.

In addition to the two listed buildings, two buildings from the GDR era have been preserved and are being converted and extended - the former GDR customs administration office building - “Platte” - and the associated former “Kantine”.

The site has remained completely unchanged to date. It is located at the widest point of the Spree (approx. 1.3 km) with an exceptional view of the “Insel der Jugend” and the Spreepark opposite and has a beautiful south-west orientation. The condition and atmosphere of the area provide ideal conditions as a film and photo location or for private and public events for up to 8,000 people.

With the “Spreestudios” site, the “Venturenauten” are realizing their first project directly on the Spree, in the Rummelsburg district of Berlin. Creative minds, organizers and free thinkers will find perfect conditions for setting up their studios, for variable and above all original spaces for exhibitions and events. The existing buildings will be respected and renovated. The density will not be maximized. A limited amount of additional construction is planned - in the form of additional storeys. The aim is to create a place of inspiration with sweeping views over the Spree and the city. A place that offers synergies to different users on the site in a very relaxed way. Between all the studio and workshop areas, the landscape remains very important as a connecting element. The open spaces of the former sunbathing lawn are to be generously preserved and will continue to define the character of the site in the future.

The existing floor plans were cleared and transformed into “open space offices”, the supporting structure was exposed, the surfaces were kept largely “rough” and glazed in color. Installations were bundled together and the Elo sub-distribution was laid visibly.

The additions to the existing buildings were constructed using the same system, utilizing the existing load reserves in steel (columns and beams) and reinforced concrete (ceilings).

Kantine

The single-storey former canteen building has three storeys with different storey heights, the outer wall is made of standardized aerated concrete elements in free laying with different widths, lengths and thicknesses. A particularly cost-effective construction that can be budgeted at just €280/m2 GFA (columns, beams, ceiling panels, façade elements).

The arrangement of the differently dimensioned elements gives this industrial façade a strong plasticity - similar to the original, plastically formed façade panels. The thickness of these aerated concrete elements meets the requirements of ENeV. It is monolithic and requires no additional thermal insulation. The surfaces are plastered in two layers and the surface texture and color are adapted to the existing StBn prefabricated elements.

Platte

The three-storey administration building will be extended by a double attic storey, the outer wall of which will also be constructed from standardized aerated concrete elements on a steel structure. The shape of the mansard is reminiscent of boats on a keel. The roofing of fired, flat tiles looks like the scales of a reptile. The roof surface can be walked on and extends the outdoor area of the Spree studios.

Awards

Iconic Award

2020

Site Plan
Floorplan Ground Floor
Floorplan 3rd Floor
Section Platte

Data

Completion

Platte 08.2019
Kantine 02.2020

Address

Köpenicker Chaussee 3 a+b
10317 Berlin

Client

Platte: Realace / Sendlinger+Conrads GbR
Kantine: Axel Schukies, Berlin

Partner

Fire protection:
BBIG Berliner Brandschutz Ingenieurgesellschaft mbH, Berlin
Supporting structure / ENEV / Building acoustics:
IB Bauwesen Horn GmbH, Leipzig
TGA: 
Janowski & Co Beratende Ingenieure GmbH, Berlin

Detail Roof
Detail Facade

The New Leitz

Stuttgart

Leitz has long been a family business with an important history for the region and Germany. Intelligent innovations in the product range and production methods have guaranteed the company a secure position in the market for generations. Entrepreneurial wisdom and technical experimentation have also had a recognizable influence on the development of the buildings on the Leitz site in every phase of the company's development: demand-oriented construction, establishing the idea of the “multi-storey factory” as the maximum flexible building form for adapting to changing production requirements or working conditions, careful handling of the public outdoor spaces through contemporary façade solutions, etc. “Keeping things in proportion” was the motif - today we call it “sustainability”.

"THE NEW LEITZ" - International Green Startup Campus

In the future, “resources” will be thought of, developed and produced here in an overarching, networked way. By “resource” we mean cultural and social resources as well as individual or communal, technical and artistic, material, (production) processes, e.g. recycling. Lateral thinking is desired, networked thinking across borders is the goal: “International Green Startup Campus”, an accelerator that consciously seeks proximity to local companies and universities.

We want to create an inspiring place that brings people together to think about contemporary issues in a cross-cultural, multi-professional way. It is an educational project, a project for development, a project for production - a cluster in the best sense of the word.

To achieve this goal, we want to change the atmosphere in the area. People must be able to work and - temporarily - live here. We are removing buildings that are not protected and adding another building to the still rudimentary ensemble of buildings along Sieglestrasse, the future “Leitz Boulevard” (Area Management City of Stuttgart). This will create public and semi-public spaces for people who work or live here. It will be quiet, the surfaces will be unsealed and the uses will be mixed.

Data

Completion

In Planning

Address

Siemensstrasse 64/
Sieglestrasse 2
70469 Stuttgart

Client

LIANEO

Partner

Interior Architecture:
bueroZ, Stuttgart

Floorplan Ground Floor
Elevation Leitz-Boulevard

Mühlengrund district

Berlin

The “Mühlengrund” in Neu-Hohenschönhausen is a popular and still affordable residential area surrounded by large-scale urban structures on the northern outskirts of Berlin. In recent years, however, infrastructural deficits have become increasingly apparent here. There was no “neighborhood center” and there is a shortage of doctors. In order to meet the growing demand for housing in Berlin and the needs of residents who have lived here for a long time, the plots of a former department store and two unprofitable new buildings from the 1990s were released for demolition a few years ago. The convenient transport connections with a streetcar stop, a beautiful stock of trees and an existing neighborhood square with a remarkable fountain sculpture provided the backdrop for a neighborhood development with three buildings around this lively outdoor space.

Building

The open floor plans of the houses are filled with a variety of different types of apartments - apartments with outside access through a private garden, single apartments and multi-storey apartments with different numbers of rooms through to open-plan apartments for five or more people. The inner courtyards are private, reserved for the building community and their guests - with children's playgrounds, trees and benches for spending time together. The access systems are developed in a differentiated manner depending on the orientation of the building, use of the ground floor and optimized escape routes. The roof areas are extensively greened or covered with PV systems for tenant electricity. Stationary traffic is organized in the basement levels of buildings 1 and 3, as are a relevant proportion of the bicycle parking spaces, the building services and storage rooms for rental units.

Construction

The three buildings of different heights and storeys - VI - VIII - were developed as 3 free-standing volumes in timber-concrete hybrid construction:
The supporting structure of each building forms a simple skeleton of reinforced concrete columns with semi-precast flat slabs. This creates a “plan libre”, a free floor plan with options for different uses and layouts: Retail and other businesses on the ground floor, the health center and offices on the first floor as a “service horizon”, then the residential floors above with a diverse mix of apartments.

Facade

The building envelope is formed by curtain-type, storey-high wall elements in timber frame construction. The elements were completely pre-assembled at the factory, insulated and clad with rear-ventilated timber or metal façades.
The material of the outer skin changes from house to house or, in some cases, from building side to building side. This creates an exciting interplay of pre-greyed timber and white trapezoidal sheet metal facades. The steel balconies, which are also completely prefabricated, puncture the timber façades in a seemingly random rhythm. Together with the free interplay of the differently sized windows, this creates an exciting façade image.

H2 | Regular Floorplan
Site Plan
H3 | Floorplan Ground Floor
H3 | Floorplan 1st Floor

Data

Completion

1. BA (House 3) 08.2020
2. BA (House 1+2) 06.2022

Address

House 1: Rotkamp 2-4
House 2: Rotkamp 6
House 3: Rüdickenstr. 33
13053 Berlin

Client

HOWOGE
Wohnungsbaugesellschaft mbH
Ferdinand-Schultze-Str. 71
13055 Berlin

Partner

Fire Protection:
ISB Hahn Ingenieurbüro, Berlin
Supporting Structure:
IB Bauwesen Horn, Leipzig
Bauphysik:
CAPE - climate architecture physics energy, Esslingen
TGA:
Janowski Ingenieure GmbH, Berlin

H3 | Elevation
H3 | Section
Detail Facade
Detail Facade

Hafenhaus

Berlin

The Hafen und Hof GmbH & Co. KG has a large number of different users. In addition to various bus operators, there is also a marina with boat rental operators and a restaurant on the site. In order to expand the offer on the site and meet demand, a new building block is being planned in this ensemble.

In the future, the new “Hafenhaus” building will provide additional gastronomic offerings, space for boarding house use, office space and space for port operations. The aim is to upgrade the location as a whole and meet the needs of current users for more space. Large parts of the first floor are planned as an air floor. This is to ensure that bus operations can continue on the site without restriction.

On the upper floors, 19 units are planned as a boarding house in various sizes. The boarding house is an accommodation facility designed for guests with longer stays. The units facing the waterfront are a special feature. A new gastronomic concept is planned for the first and second floors. The space, which is open across both floors, is to be operated as an exclusive restaurant in a living room-like atmosphere in future.

The top floor is planned as a restaurant and event space. Especially at weekends, when the bus service on the site is largely at a standstill, many Berliners already make use of the gastronomic offerings on the site. The roof terrace is intended to expand this offer both in terms of space and content. In addition to the restaurant, a pool is also planned on the roof.

The building will be constructed as a reinforced concrete skeleton structure. Only the core on the north-western side of the building will be solid. Lightweight partition walls will be made of drywall.

A comprehensive redesign of the water's edge is planned to positively influence the atmosphere on the property. The site has already been developed and the new building will be connected to the existing infrastructure.

Heat will be provided by a combined heat and power plant. In future, this will not only supply the new building, but also the existing “Hafenküche” restaurant.

Site Plan
Floor Ground Floor
Floorplan 4th Floor
Floorplan 2nd Floor
Floorplan Rooftop

Data

Completion

In Planning

Address

Zur alten Flussbadeanstalt 5
10317 Berlin
Germany

Partner

Interior Architecture: bueroZ, Stuttgart
Statics / Building Physics: IB Horn GmbH, Leipzig
Lighting Design: PS-LAB, Berlin

-

Building Service Equipment Planning: Phönix Sonnenwärme AG, Berlin
Fire Protection: brandschutz+, Berlin

Elevation North
Elevation West
Elevation South

Conversion of former RAG high-rise building

Dortmund

A place to live and experience

The interaction of working and living promotes vitality in every city center.

Life has shifted to the outskirts of cities, where, in contrast to the city center, generous green spaces are available nearby and the workplace is also easily accessible by car. As a result, the inner cities lost a large proportion of their inhabitants and were filled with work and retail space. Living and working were separated.

The digitalization of workplaces is breaking down this traditional structure. People can work from anywhere, making the traditional office building less important. Working environments are becoming more flexible and location-independent, but at the same time require an attractive range of leisure activities. New mobility concepts are increasingly making it possible to do without investing in a private car.

The conversion of the former RAG high-rise building into a residential building addresses these changes, which affect both cities and their citizens, by finding a solution for both.

A. Location

The building is in a privileged location in the heart of the city. Situated next to the opera house, it has its main entrance on the north-south axis of Hansastrasse. The extensive retail areas, the varied gastronomy and various leisure facilities can be reached on foot in a very short time. The location is very well connected thanks to its proximity to public transport, the subway and the main railway station. Users with their own vehicle can use the existing garage with 121 parking spaces.

B. Concept: a place to live and experience

The building rises like a pyramid. The existing building has structures with deep areas on the first floor and second floor, which are still suitable for commercial use with internal service cores. Our concept retains the commercial use of the first two floors - ideally, the current co-working spaces can continue to be offered - and begins with the conversion to residential space on the second floor. The new residential units are located along the existing corridors, and the flexibility of the office layout is reflected in the new apartment layout, which allows for a range of different sizes and unit types. Loggias or balconies are provided in the apartment layouts to give each resident private access to the outdoors. The roof spaces created by the staggering of the building volume on every other floor are transformed into gardens for the community of residents, which also allow for a concept of curated urban gardening. The building offers interesting views in every direction. The RAG building is no longer just a place to work, but rather a place to live and experience. The reuse of the existing building fabric, the reduction of the ecological footprint by bringing residents back into the heart of the city, the sustainable and social way of life through generous shared green spaces all fit into the current context.

A new use requires a new identity. The RAG building has very formal features with a strong presence - the regular grid of the metal panels with the horizontal bands in front contrasts with the strongly pronounced volume development of the complex.

C. Facade concept

Retention of the existing façade with integration of greenery: the curtain wall with its typical glass elements will be retained. Only the windows will be replaced to allow natural ventilation of the apartments. Individual floor-to-ceiling openings will be created that open up like a “French balcony” to the cleaning corridor and offer the residents a perceived outdoor space. This itself will be planted with climbing plants. In this way, the RAG building is covered with green strips like a tree, making the outer shell appear different depending on the season.

Data

Preliminary building application

2020

Address

Hansastraße 95
44137 Dortmund
Germany

Client

Aroundtown SA

Site Plan
Elevation
Grundriss Ground Floor
Floorplan 2nd Floor
Floorplan 10th Floor
Section

Westfalenforum – Re-think the Urban

Dortmund

The era of inner-city shopping malls and shopping streets is coming to an end. New forms of retail and digital payment methods are making old-style shopping malls obsolete. This creates the opportunity to rediscover the city as a living space and give it back to the people. However, it is by no means possible to simply replace retail with housing.

Urbanity is created through plurality

This includes mixed uses as well as different residential typologies that promote real neighborhoods and generate identification potential for one's own “Kiez”. Sustainability, the lowest possible energy requirements, resource awareness from the limited building site to the selected building materials, mobility, etc. are self-evident aspects of the planning. However, the essential characteristic should be the creation of new places where people like to live.

A - Access

A group of buildings of different types with differentiated heights forms a new neighborhood. It is linked by public paths, alleyways and small squares - for access to the buildings, small-scale retail, eating and drinking or simply for spending time. The quarter is integrated into the overarching network of routes in the city center between the main train station, Westenhellweg and Marktplatz or Hansaplatz.

B - Mixed Use

The use of the buildings and floors will be mixed. Small, adaptable stores, cafés and restaurants will be created on the first floors, which can be extended to the first floor if required. Commercial uses will also dominate the first floor - offices, doctors and the like. The basement brings the buildings together under one floor and forms a continuous storey for parking spaces, technical rooms and other ancillary areas.

C - Sustainability

The use of materials, an efficient energy concept, short distances, the multi-layered linking of individual private and public mobility, social and cultural acceptance and other sustainability aspects are developed from the outset in a multi-professional team and brought together in an overall concept. A key starting point for us is the conceptual integration of an accessible green backdrop. As a structural break, it separates the floors with commercial use from those with residential use. It runs through the buildings, the courtyards, becomes denser at selected edges, recesses or terraces and gathers as a roof garden with bridges connecting all the buildings - a multi-storey park designed for the residents of these buildings.

D - Mobility

The group of buildings on Amiens Square is located in the immediate vicinity of Dortmund's main railway station with a variety of regional and national connections as well as direct access to inner-city public transport with buses and the S-Bahn. We will combine these options with a concept that ensures individual mobility - through an internal sharing system for e-bikes and cars that are available to residents. We expect to be able to at least halve the number of parking spaces required in this way. The remaining parking space requirement will be covered in the basement.

Site Plan
Floorplan Ground Floor
Elevation West

Data

Study

2017

Address

Kampstraße 37 - 39,
Hansastraße 5
44137 Dortmund
Germany

Floorplan Regular Floor
Elevation East
Longitudinal Section

Competition Eisenwerkgelände Böhmer

Witten

The Böhmer ironworks is a former industrial site in Witten, where a company that prospered for many decades shaped urban development and has left its mark to this day. From the 50s and 60s of the 20th century until the closure of the company in 2020, structural development was always geared towards demand. The original industrial building stock is largely robust in substance, can be used flexibly due to its structure and has now been integrated into a mixed-use agglomeration as a result of unplanned development processes in the surrounding area. Today, large volumes of buildings with no specific use can be found in the vicinity of small-scale commercial enterprises, residential infrastructure and various residential buildings - a typical mix for the Ruhr region.

Activation

The building fabric is robust. Although it must be technically adapted to future requirements, there is no compelling reason for large-scale demolition. The existing buildings and the spaces in between not only shape the perception in the neighborhood, they also offer the best conditions for a comprehensive transformation process: the buildings are largely preserved. They are neutral in terms of use and are ready for short-term activation. For example, some of the halls of the former foundry are already being used as logistics space and may be activated in the long term for the “last mile”.

Each building is examined: for its structural quality, adaptability, “gray energy”, resources, future energy requirements, flexibility of use, fire protection, etc. In this way, targeted structural measures can be taken to secure the substance in the long term, to provide new uses in the short term and thus to generate the necessary income for the resilience of the portfolio.

Adaptive Idea

The initial aim is to maximize the adaptation of existing buildings - irrespective of any monument conservation assessment. Research evaluates the possibilities for transformations. The metalworking shop becomes a market hall, the assembly hall becomes a food court. Distinctive building typologies - “Blitz” - are preserved and integrated into the concept in a way that shapes the design and creates identity:

  • New building configures/contours the future context
  • Sample warehouse becomes student accommodation
  • Foundry becomes logistics location
  • Workshops may or may not remain workshops
  • Assembly hall 1 becomes a food court
  • Assembly hall 2 becomes a market hall
  • Office building becomes new office building or studio/student housing
  • Sample warehouse becomes student accommodation
  • Foundry becomes logistics location
  • Workshops may or may not remain workshops
  • Assembly hall 1 becomes a food court
  • Assembly hall 2 becomes a market hall
  • Office building becomes new office building or studio/student housing

Iterative process: Termination + Re-arrangement

Our proposal is less a concrete urban development concept and more an urban development strategy for gradual transformation and integration. A strategy that keeps options open that are perhaps not yet known today.

This is why conversion, demolition and new construction follow an iterative process. What stands in the way of development or is no longer needed is removed - if necessary, the material is recycled. Demolition and reorganization create new places, new identities - the visible/perceptible/contextual transformation process begins for everything that characterizes urban life: Eating + drinking, living, children, old people, doctors, care … „… come on you raver, you seer of visions, come on you painter, you piper, you prisoner, and shine …”.

“Housing” is becoming an important building block here. Existing buildings will be converted in various forms, e.g. the model warehouse on Westfalenstrasse, or new buildings will be constructed. To this end, we have developed a typology from the large-format, early assembly halls (not foundries) that offers differentiated spaces on a compact foodprint - flexible in use (residential, care, commercial) and adaptable and can offer variable-use spaces with greater room height on the first floor. In this way, the future urban scale is derived from the existing building, interpreted in a contemporary way and designed for the future. The load-bearing structure and technical concept (as much as necessary, as little as possible) also allow for future adaptability in these newly constructed building types. According to “Wittener Baulandmanagement”, 25% of the residential construction area will be built as subsidized housing. The floor plan organization of our buildings allows for this.

A central square will link the future and existing buildings and create a tangible, vibrant urbanity. From here, further development stages could open up the adjoining areas to the east - with residential buildings that take up the existing grain and formally follow a curved line. To the north, they face a public street (play street); to the south, private gardens are set up for the residential community. In this way, a “stitching” of new and old can gradually be created. A public thoroughfare - for pedestrians and cyclists - is to be created towards Erlenweg.

Mobility

In the future, there will be three types of traffic here - motorized, non-motorized and commuter traffic. We offer parking spaces at a central location in a garage.

Commuter traffic - logistics and commercial enterprises - will drive into the industrial estate via Westfalenstraße / vehicles for supply and disposal or ambulance transport will frequent the area temporarily and can use all roads - as can private deliveries.

Pedestrians and cyclists have barrier-free access to all areas

Private motorized traffic can drive directly to the buildings for deliveries and then park their cars in the garage.

Parking: The parking space concept is based on the mix of uses desired by the developer, including care, retail (market hall), medical practices, offices, residential, etc. Accordingly, no underground parking garage is required. Should the requirements/mix change, partial underground parking garages with natural ventilation can be built under the footprints of the buildings.

Awards

1st Prize
Urban planning qualification procedure

Data

Competition

2023

Address

Böhmerareal
58453 Witten

Awarding Authority

Stadt Witten - Planning department

Partner

Interior Architecture: bueroZ, Stuttgart

House at MIR

Gelsenkirchen

With its wedge-shaped cubature and variety of uses, the Haus am MIR mediates between the public use of the “Musiktheater im Revier - MIR” and the adjacent residential development to the east of Schalker Strasse. In terms of space and design, the new building frames and accentuates the current, very heterogeneous “non-space” on the east side of the MIR.

The recessed first floor is integrated into the public space through its transparency. This effect is reinforced by a homogeneously designed theater forecourt surface that incorporates the new building. An independent, highly recognizable urban space is created between the different uses.

Data

Completion

1997

Address

Kennedyplatz 14
45881 Gelsenkirchen

Client

Musiktheater im Revier, Gelsenkirchen

Detail Façade

Residential and Commercial Building Königswall

Dortmund

The property on Königswall is located in the immediate vicinity of the Dortmunder U, the soccer museum, the Kampstrasse boulevard and the main railway station. It is currently developed with a 3-storey office building from the 1950s. In the immediate vicinity, adjacent to the west, a mixed residential and office complex with 3 buildings on a common base has just been built. A high-rise building forms a striking accent and the conclusion on the corner.

The ageing existing building has a clear, simple skeleton structure with a column grid of 4 meters. The original plans envisaged a building with up to 6 storeys. It can therefore be assumed that it is possible to add a storey to the existing building. The building has a full basement.

The current proposal for conversion and extension envisages 6 storeys, with an additional penthouse on the roof. The existing single-storey side wing in the courtyard is to be demolished. There are several options for the courtyard: from keeping it free as a parking lot to a completely single-storey superstructure as a ground-floor office extension of the front building with small green inner courtyards.

The planned conversion of the front building will have 1 or 2 office floors on the ground floor and 1st floor and apartments above, either 1-room apartments or 2-3 room apartments, some as two-storey maisonettes. A particularly spacious penthouse apartment, also extending over two floors, with a roof terrace and roof garden is planned for the top floor.

Access to the building will be completely reorganized with a new staircase and elevator on the street side. All units will be accessed from here. Up to 6 apartments are connected on each of the apartment floors. While the wet cores are largely predefined, all units can be designed as open spaces or with room divisions. The entire building is planned to be barrier-free. The building can be accessed from Königswall and therefore does not require a second escape staircase.

The new exterior design of the building is intended to attract attention with an expressive façade. This consists largely of curtain-type prefabricated elements. Their alternating suspension creates a dynamic and exciting façade appearance. At the front, the view is further enlivened by protruding bay windows. On the western front side, the façade structure is led around the corner and can have windows despite its location on the property boundary due to the existing neighborhood approval. The south side is to form an attractive and pleasant outdoor space with projecting and planted terraces, thus improving the quality of the courtyard. In conjunction with the planned new residential building on the opposite plot on Schmiedingstrasse, the character of the entire quarter will soon meet today's demands for a high-quality, inner-city living and working environment.

Data

Study

2021

Address

Königswall 2
44137 Dortmund

Client

Grün Objektgesellschaft mbH

Elevation North
Elevation South
Section Penthouse
Cross-Section
Longitudinal Section

Urban Densification Study Nordhafenquartier

Berlin

The most urgent goal of the urban densification study for the Nordhafen quarter is to develop the site as part of a future living environment in the new Europacity. For us, Europaplatz is an urban campus - a meeting place for residents and everyone who works here.

In addition, the study discusses the overlapping of private and publicly accessible uses, in parts also within the building, as well as the possibilities of resource-saving measures for heating and cooling at this special location.

A new district emerges

The inner-city wasteland, which has so far been largely unused or only rudimentarily used, is set to become a lively district with a direct connection to Berlin's main railway station. Despite good connections to the transport network, the site must nevertheless be understood and thought of as an island, as it is separated from the surrounding districts by various spatial barriers. Extensive railway tracks prevent direct contact with Wedding, while the Spree Canal forms a natural border with Mitte. New bridge connections will counteract this peculiarity, but will not be able to eliminate it. This makes the new district's own urban identity all the more important. The newly created town square as the heart of the new quarter will become an address, the inner open spaces a private garden.

Construction and sustainability

The complexity and multitude of technical systems should be kept to a necessary minimum. To this end, the solid components are activated and circulated with cool night air so that the coolness stored at night naturally compensates for the internal heat loads that arise during the day. Earth ducts and - where possible - evaporative cooling from the Spree canal provide the necessary cold air. Circulation through the building is initiated by a “chimney” (stair tower), which is routed beyond the parapet edge of the building.

Site Plan
Implementation and urban context
Floorplan Ground Floor

Data

Completion

2013

Address

Heidestraße
10557 Berlin
Germany

Client

CA Immo, Berlin

Elevation West | Façade Structure
Elevation Detail | Façade Structure
Section | Façade
Cross-Section | Cooling strategy
Floorplan 10th Floor
Elevation South | Façade Structure